Brad Gadt, heavy equipment outage and relocations manager at Luminant Mining, explained at Mining Media's Haulage Loading 2015 conference how the multidragline move grew from two machines to four. Initially, plans were to move two 8750 draglines from one site to another—one by walking it, the other by some means of transport.
WhatsApp: +86 18203695377With over 100 years of experience, our mining capabilities are extensive. We leverage our vast experience in true partnership to achieve your goals. As the largest lignite producer in the, we operate mines with annual production levels ranging from a few hundred thousand tons per year to more than 10 million. We specialize in reserve ...
WhatsApp: +86 18203695377The dragline sits on the top of the overburden bench, usually 50 m or so wide on the highwall side and excavates the material in front of itself to dump it on the strip's low wall or spoil side to uncover the coal seam. A dragline can easily dump the excavated overburden materials to a distance of around 100 m from the machine.
WhatsApp: +86 18203695377The Walking Mechanism on a preserved BucyrusErie 1150 dragline in the UK. The coal mining dragline known as Big Muskie, owned by the Central Ohio Coal Company (a division of American Electric Power), was the world's largest mobile earthmoving machine, weighing nearly 13,000 tonnes and standing nearly 22 stories tall.
WhatsApp: +86 18203695377CBET01 301P. The size of the dragline is based on the capacity of the drag bucket. A 15 yd dragline has a bucket capacity of 15 yd 3 . Typically draglines are in the range of 60 150 yd. The largest one ever built had a bucket capacity of 220 yd 3 . It could fill the bucket, swing it to the dump point nearly 300' from the machine, dump ...
WhatsApp: +86 18203695377Ursa Major in 2009. The Ursa Major (lit. Great Bear) at Black Thunder Coal Mine, Wyoming, is the largest dragline excavator currently in use in North America and the third largest ever built. [1] [2] It is a BucyrusErie 2570WS model and cost US50 million. The Ursa Major was one of five large walking draglines operated at Black Thunder, with ...
WhatsApp: +86 18203695377Working of dragline in opencast mining#Dragline #draglineworking #draglinecoalminingTags: Dragline, ncl, coal mines, Opencast mines, Dragline in OCP, openca...
WhatsApp: +86 18203695377CENTER A coal mining company in Center commissioned a 31 million dragline Monday and is about six weeks from putting the massive coal miner to use. BNI Coal hosted the ceremony at its Center Mine.
WhatsApp: +86 18203695377The Marion Power Shovel Company (established in 1880) built its first walking dragline with a simple singlecrank mechanism in 1939. Its largest dragline was the 8950 sold to Amax Coal Company in 1973. It featured a 150cubic yard bucket on a 310foot boom and weighed 7,300 tons. Marion was acquired by Bucyrus in 1997.
WhatsApp: +86 18203695377and cost per tonne of coal exposed by dragline . Evaluation of Availability and Utilization 41 . The maximum depth that can be worked by a dragline 45 . Amount of rehandle (PRM) 45 . Calculation of ownership and operating cost of dragline 46 (Singareni OCI dragline)
WhatsApp: +86 18203695377FLANDERS dragline motors are purposeengineered and purposebuilt for draglines. They have, among many technology improvements, complete Class H+ (220° C) insulation and have copperbarred rotors for higher efficiency and better torque density. Manufactured in our stateoftheart facilities, to tighter specs than conventional systems ...
WhatsApp: +86 18203695377Draglines are really interesting mining machines. "Having produced dragline buckets and rigging for over 90 years, and having produced more than 8700 dragline buckets during that time, we are continually learning," he said. "Learning and innovation are the most exciting part of this product."
WhatsApp: +86 18203695377Horizontal Tandem Operation. In the horizontal tandem operation (Fig. 1), both the draglines are deployed on the same bench for a fast rate of advance and coal exposure [13, 14].The cut width taken by the draglines will be wider depending upon the operating radius of the draglines [].The leading dragline is deployed on the highwall side and provides a key cut toward the highwall, and after ...
WhatsApp: +86 18203695377The Armstrong AC dragline is not the first ACpowered dragline. It is, however, the first AC dragline retrofit operating in the —the country that has the most draglines in operation. The 23yd 770 is a small machine with a 215ft boom, but the technology is scalable. Not long after the machine was commissioned, the mine began to see results.
WhatsApp: +86 18203695377LHD (load haul dumper) is now used as a loading machine for intermediate mechanization in underground coal mining. For survival in the intense competition in the global business environment in ...
WhatsApp: +86 18203695377The dragline is one of the most energyintensive equipments in surface coal mines. With high production rate and low cost of operation, draglines are commonly used for removing large amounts of overburden to expose coal seams for extraction. Draglines consume about 1530% of total mine energy consumption. Improving dragline energy efficiency ...
WhatsApp: +86 18203695377In an Indian study for a large dragline operated surface coal mine, a 40% gain in OE in terms of mining rate (m3/hr) resulted in a gain in EE with an annual reduction of GHG, TSP, and PM10 ...
WhatsApp: +86 18203695377The electrically operated dragline stands 286 feet high and required 214 trucks to deliver it in pieces from Mississippi to the mine outside of Center. CENTER A coal mining company in Center ...
WhatsApp: +86 18203695377Dragline: Dragline mining is the most costeffective technology for the bedded deposits and is the firstchoice technology for large opencast mining. Total of 32 draglines are in use in Coal India Ltd. of which maximum no. of 23 are in NCL. Purchase Orders for 5 nos. 24/96 Dragline amounting to Rs 2400 Crores
WhatsApp: +86 18203695377The PH 9020C dragline offers a bucket capacity of 75 117 yd3 and a boom length of 300 405 feet. ... Aframe engineered to effectively manage load forces ... Track your machine's performance to support efficient operation and maintenance activities. The Centurion control system utilizes smart electronics to monitor dragline operation.
WhatsApp: +86 18203695377It was detected from failure statistics that operations of Dragline1 and Dragline2 were halted for 938 and 903 times due to failures, yielding total breakdown duration of 13,954 and 16,471 h, respectively. Quantitative contribution of each subsystem to maintenance numbers and maintenance breakdowns can be viewed in Figure 2.
WhatsApp: +86 18203695377I don't think they ran out of coal. In 1999, the US Army Corps of Engineers got caught cheating and eventually quit granting mining permits because of environmental impact issues. [youtube comments] It appears that through the magic of bankruptcies, the coal corporations are dodging pensions, health plans and site cleanup. "Today, Hobet is ...
WhatsApp: +86 18203695377MACHINES Performance Analysis of a Digitally Retrofitted Ward Leonard Control Dragline—A Case Study in Coal Mine P. Manikandana,b* and T. Maitya ... consumption has been calculated as energy consumption per cubic meter of load movement by the dragline and is tabulated in the same table. The average specificenergy consumption for one year ...
WhatsApp: +86 18203695377Dragline: Dragline mining is the most costeffective technology for the bedded deposits and is the firstchoice technology for large opencast of 32 draglines are in use in Coal India Ltd. of which maximum no. of 23 are in NCL. Purchase Orders for 5 nos. 24/96 Dragline amounting to Rs 2400 Crores
WhatsApp: +86 18203695377load piled up material as a shovel. Draglines are ... the pullback method would In a twodragline system, one machine must operate at the pace set by the other. seem to be a solution. ... be beyond the capacity of the dragline to spoil off the coal by any of the previous methods described. In this case, a secondary dragline can be ...
WhatsApp: +86 18203695377